Constructing A Leading Facility In The Heart Of Texas


Chevron Philips NGL didn’t just ask us to build them a new facility—they wanted it to be rated as blast resistant. We eagerly took the challenge, building the plant a brand new structure to house their panel controls. Not only is the building blast resistant, but it’s a modern and useful addition to the plant.

The Details


With the help of Brad Adams Walker Architecture, we built a truly blast-resistant facility for Chevron Philips NGL. At 11,524, the new building is as substantial as it is durable. It’s both rugged and contemporary in its design thanks to awesome engineering and expert construction. Sometimes it is possible to have the best of both worlds.

Privacy Preference Center